Pumping Stations
ReferenciasCanal Algerri-Balaguer
E.B. Captación Alfarras. (Automation and expansion)
- Installation of 2800 KW. To 500 V.
- Distributed to: Sector A 4 pumps of 450KW and Sector B 4 pumps of 250 KW
E.B. de Algerri. (Automation and expansion)
- Installation of 2800 KW. To 500 V.
- Distributed to: Sector A 4 pumps of 450KW and Sector B 4 pumps of 250 KW.
E.B. de Castelló de Farfanya.
- Installation of 3060 KW to 660V.
- Distributed to : Sector A 4 pumps of 450KW . and sector B 315KW
Garrigues Sud
Garrigues Sud (Sud = South)
E.B.1 Phase IV Flix Captación.
- Installation of 10000KW. to 6KV. And 350Kw. to 400V.
- Distributed in: 4 pumps of 2500KW. and one filling pump of 350KW
E.B.2 Phase IV Palma d’Ebre.
- Installation of 11.200 KW to 6KV. and 250Kw. to 400V.
- Distributed in: 4 pumps of 2800Kw and 1 filling pump of 250KW
E.B.3 Bellaguarda.
- Installation of 1.750KW to 415V.
- Distributed in: Phase IV 3 pumps of 250KW and Phase VI 2 pumps of 500KW
Terra Alta
E.B.0. Captación. (Automation)
- Installation of 790KW to 400V.
- Distributed in : 2 pumps of 250KW . and 1 pump of 290KW.
E.B.1. (Automation)
- Installation of 3000KW to 6KV
- Distributed in : 3 pumps of 1000KW.
E.B.2. (Automation and installation E.B.2.4)
- Installation of 6660KW to 690V.
- Distributed in : E.B.2.1 3 pumps of 560KW. E.B.2.2 3pumps of 1000KW. E.B.2.3 2 pumps of 315KW and E.B.2.4 3 pumps of 450KW
E.B.3.R
- Installation of 330Kw to 400V.
- Web directly injected pumping distributed in : 3 pumps of 90KW and 2 filling pumps of 30KW.
Canal Segarra Garrigues
E.B. sector 4.1
- Installation of 6920KW. to 690V
- Distributed in: Sector A 6 pumps of 710KW. Sector B 5 pumps of 500KW. and 1 pump of 160KW.
E.B. sector 7
- Installation of 2037KW. to 690V.
- Distributed in: 4 pumps of 500KW. and 1 filling pump of 37KW
E.B. sector 8
- Installation of 2800 KW. to 690V.
- Distributed in: 5 pumps of 560KW.
E.B. sector 9.1 (Control and Automation)
- Installation of 1260 to 690V.
- Distributed in: 4 pumps of 315KW. and 1 filling pump of 200KW.
E.B. sector 4.2. (Control and automation)
- Installation of 1132 KW. to 690 V.
- Distributed in: 4 pumps of 250KW. and 1 filling pump of 132KW
E.B. sector XP-01. (Control and automation)
- Installation of 3952KW to 690V
- Distributed in: Sector A 4 pumps of 315 KW. and 1 filling pump of 37KW. Sector B 4 pumps of 630KW. and 1 filling pump of 135KW.
E.B. sector XP-02
- Installation of 1552KW. to 690V.
- Distributed in: Sector A 4 pumps of 200 KW and 1 filling pump of 75KW. Sector B 4 pumps of 160 KW and 1 filing pump of 37KW.
E.B. rebombeo sector 2
- Installation of 570KW to 400V
- Web directly injected pumping distributed in: 5 pumps of 110 KW. and 2 filling pumps of 30KW.
Provisional pumping of the wells of Vinallop,Tortosa (Decontamination project of the Flix’s dam)
Well 6
- Installation of 33KW. to 400V.
- Distributed in: 1 water-proof pump of 33KW. at 45m depth.
Well 7
- Installation of 50KW. to 400V.
- Distributed in: 1 water-proof pump of 50KW at 93m depth.
Well 9
- Installation of 33KW. to 400V.
- Distributed in: 1 water-proof pump of 33KW at 82m depth
Well 10
- Installation of 110KW. to 400V.
- Distributed in: 1 water-proof pump of 110KW . at 89m depth
Well 11
- Installation of 400KW to 400V.
- Distributed in: 1 water-proof pump of 400W at 100m depth
Well 12
- Installation of 270KW. to 400V
- Distributed in: 1 water-proof pump of 270KW at 80m depth
Well 1 CAT
- Installation of 280KW. to 400V.
- Distributed in: 1 vertical pump of 280KW.
Well 2 CAT. (Tortosa supply)
- Installation of 65KW to 400V.
- Distributed in: 1 pump of 65KW.
Segriá Sur
E.B.3 (Control and Automation)
- Installation of 480KW. to 400V
- Distributed in: 3 pumps of 160KW.